Warehouse Capacity: Is Europe Ready for Peak?
Every year, the same conversation happens during the same week of September. Someone runs the numbers on inbound volume against available pallet positions, and the answer comes back tighter than expected. Then the scramble starts.
The difference this year is that the market has less slack than it did twelve months ago, and the buffer that used to absorb a late decision is thinning out.
If your Q4 capacity plan is still a draft, this is the moment to finalise it.
Key Takeaways
- European logistics vacancy could fall below 5% as new supply hits a nine-year low.
- Western corridors such as Brussels to Antwerp are close to full (2.33% vacancy). CEE has more room (up to about 8%) but demand is strong.
- Grid power is now a site-selection constraint, not a detail.
- Contracted space beats verbal commitments. Space secured in August costs less and offers more choice than space secured in November.
How Tight Is the European Warehouse Market Going Into Q4?
European logistics take-up has been recovering steadily. Through 2025, quarterly take-up stabilised between 5 and 6 million square metres, still below the 9.6 million square metre peak recorded in Q4 2021, but a clear improvement on a difficult 2024. Forecasts point to continued moderate growth.
The more interesting number is on the supply side. Only around 3.8% of total European logistics stock was under construction by mid-2025, and twelve-month rolling completions are expected to hit a nine-year low as the development pipeline stays muted. A growing share of completed space is already committed before it opens.
Prologis research estimates Europe needs roughly €150 billion of new logistics space just to meet current consumption levels. The forecast is that European vacancy could fall below 5% if supply pipelines stay constrained and economic growth holds, which would make Europe one of the tightest logistics markets in the world. Prologis also describes power as the new location factor in its 2026 outlook.
None of this is a cliff. It is a slow squeeze, which is precisely why it catches people out. Nothing dramatic happens until the week you need space and there is none available in the corridor where you need it.
Where Is the Pressure Concentrated: Western Europe or CEE?
The averages hide a lot. Utilisation rates remain high in France, Germany, and the Netherlands, leaving very little room for overflow inventory when peak-season volume arrives. In some Western European corridors, availability is effectively nil. Vacancy along Belgium’s Brussels-to-Antwerp corridor stood at 2.33% at the end of 2025.
Central and Eastern Europe reads differently. Vacancy runs higher, at up to around 8% in Poland and the wider CEE region, but absorption is enormously strong, driven by nearshoring from Western Europe. Poland recorded roughly 1.6 million square metres of gross take-up in Q1 2026, up around 40% year-on-year, with net take-up rising by approximately 75%. The vacancy rate stood at 7.2%, with new supply of about 650,000 square metres.
| Metric | Figure |
| Brussels to Antwerp vacancy, end of 2025 | 2.33% |
| Poland vacancy, Q1 2026 | 7.2% |
| Poland gross take-up, Q1 2026 | about 1.6 million sq m (up about 40% year on year) |
| Poland net take-up, Q1 2026 | up about 75% year on year |
| Poland new supply, Q1 2026 | about 650,000 sq m |
| European logistics stock under construction, mid-2025 | about 3.8% |
| Projected rental growth, 2026 and 2027 | about 2% a year |
That combination matters more than either figure alone. This is not a market absorbing renewals. New leases and expansions made up a significant share of activity, which means the demand has genuine depth. The Чешка и Румунија have both posted strong annual take-up growth as well.
Read together, the picture is of a region with real available capacity and real competition for it.
Why Is Electricity Now a Warehouse Site-Selection Issue?
There is a newer bottleneck that has moved from a technical footnote to a genuine site-selection issue: electricity.
Већина европских електроенергетских мрежа је близу капацитета или је већ попуњена. Како дистрибутивни центри постају све аутоматизованији и електрификованији, њихове потребе за напајањем надмашују доступне прикључке. Обезбеђивање довољног капацитета мреже за модерно складиште спремно за аутоматизацију сада се сматра кључним, а на неким тржиштима то је ограничавајући фактор који одређује да ли је локација уопште одржива.
For anyone planning capacity that involves automation, refrigeration, or electric vehicle charging infrastructure, power availability needs to be on the checklist alongside floor area and dock doors. It is not a detail that gets sorted out later. The same power constraint is shaping where life science manufacturers build, as we cover in Где фарма индустриja гради у ЦИЕ.
Шта окупатори заправо траже
Where demand is strong, it is concentrated on a fairly specific building profile. Occupiers have consistently favoured high-specification stock: clear heights of 10 to 12 metres, strong floor loading, generous yard depth, and a design that meets environmental certification requirements.
За то постоји разлог који је дубљи од обичне преференције. Велики део тренутне активности на тржишту одражава компаније које врше замену некретнина уместо да се шире, односно селе се из старијих, мање ефикасних објеката у простор који је заиста прилагођен аутоматизованим операцијама које захтевају много енергије. Нето апсорпција се не очекује у потпуности да се опорави све до 2027. године, управо зато што се део новог закупa поништава простором који се на другим местима ослобађа.
The practical implication: the weakest assets are becoming more exposed, and the best assets are getting taken. If your Q4 plan depends on finding well-specified space in a strong corridor at short notice, you are competing for the smallest part of the market. Browse CTP’s logistics and warehouse solutions for build-to-suit and ready-to-occupy options.
Five Questions to Answer Before Peak Season
-
Која је ваша стварна прогноза вршног обима, а не прошлогодишња увећана за проценат?
Врхунско планирање засновано на претпоставкама из претходне године је начин на који настају трошкови преливања.
-
Где се физички налази ваш бафер?
Капацитет за прелив у две државе даље од ваше потражње је ставка у буџету, а не решење.
-
Да ли имате капацитет мреже за оно што покрећете?
Ако додајете аутоматизацију или контролу температуре, потврдите прикључак за напајање пре него што потврдите било шта друго.
-
Да li je vaš prostor za nepredviđene situacije smanjen ili samo o njemu razgovarate?
На тржишту где је број завршених радова пао на најнижи ниво у последњих девет година, усмени договор из септембра вреди веома мало у новембру.
-
Како изгледа следећа година?
If your peak requirement is becoming structural rather than seasonal, short-term overflow arrangements are an expensive way to solve a permanent problem.
Should You Secure Warehouse Capacity Early?
Тржиште није у кризи. Заузетост умерено расте, слободан простор у ЦИЕ остаје на прихватљивом нивоу, а предвиђа се да ће раст закупнина износити око поднесушљивих % годишње до 2026. и 2027. године.
But the direction of travel is clear. Supply is constrained by rising construction costs, planning restrictions, and grid capacity limits, none of which can be resolved quickly. Nearshoring continues to anchor demand in Central and Eastern Europe as production networks diversify away from Asia. And occupier surveys suggest that 47% intend to increase their footprints, against just 4% planning to reduce them.
Securing space in August costs less and gives you more choice than securing it in November. That has always been true. It is simply more true in a market where the pipeline is thinning.
Да ли је потребно обезбедити капацитет пре вршног оптерећења? Проверите доступност across more than 270 locations in the CTPark Network, from the North Sea to the Black Sea.