25. 06. 2025

CTP builds a unique project in Brno – the first two-story industrial hall in the Czech Republic

CTP, Europe’s largest listed industrial developer, has started construction of the first two-storey hall of its kind in the Czech Republic in Brno. The so-called “doubledecker” will be built in CTPark Brno Líšeň on the site of the former Zetor complex. When completed at the end of 2025, it will offer almost 50,000 sqm of flexible space for production, logistics and services. The project follows a successful model implemented by CTP in the Netherlands and offers a smart solution for urban brownfields – it respects the character of the location, brings modern facilities and makes efficient use of limited space.

The two-storey hall brings a completely new model of industrial construction to the urban environment. It responds to the limited spatial possibilities within cities and allows for a double use of the built-up area. With two separate entrances for freight traffic, each floor can operate separately, significantly broadening usage options and allowing flexible division of space for different types of operations. The building is structurally designed for high loads, partially recessed into the slope, and ready for more demanding production technologies or automation. CTP’s design is based on the experience of the Netherlands, where it has already successfully implemented a similar concept.

The Brno doubledecker will also offer a range of sustainable solutions from the use of waste heat from the SAKO Brno incinerator to green infrastructure and planned charging stations for electric vehicles. A high emphasis is also placed on the efficient management of building materials. A significant part of the demolition waste from the original hall is reused in the construction process, for example in the form of recycled concrete for road structures and industrial floors. Preliminary earthworks are currently underway, with the building’s completion scheduled for the end of 2025. Over 40% of the space has already been pre-leased.

Jakub Kodr, Managing Director at CTP in the Czech Republic, says:

“Doubledecker in Brno is the answer to the challenges that every major city faces today - how to make efficient use of limited space, preserve the character of the place and at the same time offer top-class facilities for production and technology. It is not an experiment, but a thoughtful step based on experience from abroad. We paid great attention to the technical design and to making the hall fit in with its surroundings. I am convinced that the result will be not only functional but also inspiring.”
 

In addition to the former gear production hall, other parts of the premises will also be revitalized. The former forge will give way to a completely new hall, which is designed to suit the specific tenant and its operational needs. Demolition of the original building began in May and is expected to be completed within three months. The construction of the new hall will take until the end of the year and once completed, the facility will be gradually handed over to operations. Some existing buildings are also being put to temporary use. One example is the ZET9 building, which since June 2023 has served as a community hub for cultural and creative activities. It now houses music rehearsal rooms, art studios, workshops and spaces for small businesses. This approach supports the development of Brno’s cultural and community scene and shows how brownfields can be actively involved in the life of the city before their final transformation.

Michal Dospěl, Regional Construction Director at CTP in the Czech Republic, explains:

“Transforming a former industrial site into a fully-fledged part of the city is always technically and economically challenging – the history of the area often translates into complex construction conditions and higher costs. On the other hand, such places have enormous potential. They are part of the urban fabric, and if they are conceived smartly, they can offer more than ever before.”
 

The project is based on a combination of quality architecture, smart technical solutions and close cooperation with the city of Brno. As part of the further development of the site, a new pedestrian and bicycle corridor will be created to connect the site with the Stránská skála public transport stop and remove a long-standing barrier between the brownfield and surrounding neighbourhoods. There are also plans to build a car park with a capacity of over 300 spaces, providing parking for employees and visitors, while easing the traffic situation in the area. Currently, 22 companies operate in the area with over 1,300 employees, and this number is expected to grow as the site continues to develop.

Břetislav Štefan, Mayor of the Brno-Líšeň district, says:

“Brno has a number of industrial areas awaiting new purpose. In Brno Líšeň, one of them is being transformed in a way that combines modern construction, sustainability, and respect for the history of the place. We appreciate the fact that the project also provides for public space, a cycle path, and community facilities. Such development is beneficial for Brno - it increases the attractiveness of the city for other investors and brings new job opportunities.”
 

The site in Brno Líšeň is historically tied to the Zetor brand and has been producing tractor engines and gearboxes for domestic and foreign markets since 1946. The industrial heritage of the site is an integral part of its identity, and CTP builds on it with respect. The aim of the project is to develop this tradition and turn the site into a fully functional place with a future perspective, combining quality architecture, technological readiness, and sensitive urban integration.

 

 

 

关于 CTP
CTP是欧洲最大的上市物流和工业地产所有者、开发商和管理者(按可出租总面积计算),截至2025年3月31日,其在10个国家拥有1340万平方米的可出租总面积。CTP为所有新建建筑提供BREEAM“非常好”或更佳的认证,并获得了Sustainalytics授予的可忽略不计风险的ESG评级,彰显了其致力于可持续发展的承诺。欲了解更多信息,请访问CTP公司网站: www.ctp.eu

 

分析师和投资者咨询的详细联系方式:
CTP
投资者关系主管 Maarten Otte
电子邮件: maarten.otte@ctp.eu

投资者关系团队
电子邮件:investor.relations@ctp.eu

媒体垂询联系方式:
Patryk Statkiewicz
集团营销与公关负责人
手机: +31 (0) 629 596 119+31 (0) 629 596 119
电子邮件: patryk.statkiewicz@ctp.eu

 

关于前瞻性信息的重要通知
本公告包含若干有关 CTP 财务状况、经营业绩和业务的前瞻性陈述。这些前瞻性表述可以通过使用前瞻性术语来识别,包括 "相信"、"估计"、"计划"、"项目"、"预计"、"期望"、"打算"、"目标"、"可能"、"旨在"、"可能"、"会"、"可能"、"可以"、"可以有"、"将 "或 "应该 "等术语,或在每种情况下,其反义词或其他变体或类似术语。前瞻性陈述可能而且经常与实际结果存在实质性差异。因此,不应对任何前瞻性陈述施加不当影响。

画廊

商业联络

Linkedin

园区地址

获取优惠

    要求